Order matters, as it does on a real job: the cone washer goes on the tank floor before the fill valve drops in; the locknut threads up the shank under the tank before the supply line's nut goes on below it; the flapper and the handle go in before the chain joins them. Then set it: the water stops about 1″ below the top of the overflow tube, nuts go on by hand plus a quarter turn, and the chain gets about ½″ of slack.